sts-70-rollout_9458238695_o.jpg KSC-95PC-1614BélyegképekDecember 11, 1995 Weather Status ReportKSC-95PC-1614BélyegképekDecember 11, 1995 Weather Status Report
The Crawler Transporter brings the Space Shuttle Discovery on its Mobile Launcher Platform into position at Launch Pad 39B, following rollout from the Vehicle Assembly Building. The Fixed Service Structure and the Rotating Service Structure, permanent parts of the launch pad, are left of the Shuttle. Discovery and its crew of five lifted off on July 13, 1995, on a satellite deployment mission, STS-70. Meanwhile, sister ship Atlantis was poised for launch from Pad 39A on a mission to rendezvous and dock with the Russian Mir Space Station. Atlantis lifted off on STS-71 on June 27, 1995.
Information
Taken in
Kennedy Space Center
Szerző
NASA
Leírás
The Crawler Transporter brings the Space Shuttle Discovery on its Mobile Launcher Platform into position at Launch Pad 39B, following rollout from the Vehicle Assembly Building. The Fixed Service Structure and the Rotating Service Structure, permanent parts of the launch pad, are left of the Shuttle. Discovery and its crew of five lifted off on July 13, 1995, on a satellite deployment mission, STS-70. Meanwhile, sister ship Atlantis was poised for launch from Pad 39A on a mission to rendezvous and dock with the Russian Mir Space Station. Atlantis lifted off on STS-71 on June 27, 1995.
Source link
https://www.flickr.com/photos/nasacommons/albums/72157634975731504
Látogatás
80
Location
View on OpenStreetMap
Átlagos pontszám
még nincs értékelve
Értékelje a képet
License
Public Domain
Modified by WikiArchives
No (original)
Letöltés
2
EXIF metaadatok
DateTimeOriginal
1995:05:11 00:00:00