KSC-02PD-0246.jpg KSC-99PP-0773ThumbnailsKSC-02PD-0247KSC-99PP-0773ThumbnailsKSC-02PD-0247KSC-99PP-0773ThumbnailsKSC-02PD-0247KSC-99PP-0773ThumbnailsKSC-02PD-0247
Orbiter Atlantis rolls out of the Orbiter Processing Facility on its way to the Vehicle Assembly Building for space vehicle mate. As part of final preparations before transfer to the launch pad, Atlantis will be lifted vertically into its VAB high bay and mated to the twin solid rocket boosters and external tank. The STS-110 mission resumes International Space Station assembly operations with the delivery of the S0 truss, which will support solar panels providing additional power to the Station. The payload will also include the first part of a Mobile Transporter that will provide a moveable base for the Station’s Canadian robotic arm. STS-110 is scheduled for launch April 4.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
Orbiter Atlantis rolls out of the Orbiter Processing Facility on its way to the Vehicle Assembly Building for space vehicle mate. As part of final preparations before transfer to the launch pad, Atlantis will be lifted vertically into its VAB high bay and mated to the twin solid rocket boosters and external tank. The STS-110 mission resumes International Space Station assembly operations with the delivery of the S0 truss, which will support solar panels providing additional power to the Station. The payload will also include the first part of a Mobile Transporter that will provide a moveable base for the Station’s Canadian robotic arm. STS-110 is scheduled for launch April 4.
Source link
https://science.ksc.nasa.gov/gallery/photos/2002/captions/
Visits
52
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC
Modified by WikiArchives
No (original)
Downloads
1
EXIF Metadata
NIKON CORPORATION NIKON D1
Make
NIKON CORPORATION
Model
NIKON D1
DateTimeOriginal
2002:03:07 00:37:49
ApertureFNumber
f/13.0