KSC-00PP-1678.jpg KSC-00PP-1677الصور المصغرةKSC-00PP-1679KSC-00PP-1677الصور المصغرةKSC-00PP-1679
On the 195-foot level at Launch Pad 39B, STS-97 Commander Brent Jett reaches for the lever to release the slidewire basket that also holds Pilot Mike Bloomfield (right). They are practicing their emergency egress training from Endeavour as part of Terminal Countdown Demonstration Test (TCDT) activities. The TCDT also includes a simulated launch countdown and opportunities to inspect the mission payloads in the orbiter’s payload bay. Mission STS-97is the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections. STS-97 is scheduled to launch Nov. 30 at 10:05 p.m. EST.
Information
Taken in
Kennedy Space Center
بواسطة :
NASA
الوصف
On the 195-foot level at Launch Pad 39B, STS-97 Commander Brent Jett reaches for the lever to release the slidewire basket that also holds Pilot Mike Bloomfield (right). They are practicing their emergency egress training from Endeavour as part of Terminal Countdown Demonstration Test (TCDT) activities. The TCDT also includes a simulated launch countdown and opportunities to inspect the mission payloads in the orbiter’s payload bay. Mission STS-97is the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections. STS-97 is scheduled to launch Nov. 30 at 10:05 p.m. EST.
تاريخ الصورة
الأربعاء 8 نوفمبر 2000
Source link
https://science.ksc.nasa.gov/gallery/photos/2000/
الزوار
29
Location
View on OpenStreetMap
حسب معدل التقييم
كن أول من يعطي تقيمه لهذه الصورة
قيم هذه الصورة
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
تنزيل
1