KSC-99PP-1169.jpg KSC-99PP-1168ThumbnailsKSC-99PP-1170KSC-99PP-1168ThumbnailsKSC-99PP-1170
A short during liftoff of Space Shuttle Columbia in July was traced to a wire in the payload bay with damaged insulation. As a result of that problem, NASA decided to inspect much of the wiring in all four Space Shuttles and make repairs as required. Here technicians are examining, repairing and protecting the wires onboard orbiter Discovery as necessary. The next Shuttle mission, STS-103, the Third Hubble Space Telescope Servicing Mission, is currently scheduled for launch no earlier than Nov. 19, 1999.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
A short during liftoff of Space Shuttle Columbia in July was traced to a wire in the payload bay with damaged insulation. As a result of that problem, NASA decided to inspect much of the wiring in all four Space Shuttles and make repairs as required. Here technicians are examining, repairing and protecting the wires onboard orbiter Discovery as necessary. The next Shuttle mission, STS-103, the Third Hubble Space Telescope Servicing Mission, is currently scheduled for launch no earlier than Nov. 19, 1999.
Source link
https://science.ksc.nasa.gov/gallery/photos/1999/
Visits
41
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0