KSC-20220316-PH-GEB01-0022.jpg KSC-20220316-PH-GEB02-0009MiniatyrbilderKSC-20220323-PH-JBS01-0003KSC-20220316-PH-GEB02-0009MiniatyrbilderKSC-20220323-PH-JBS01-0003
In this view looking down in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, all of the work platforms that surround the Artemis I Space Launch System (SLS) and Orion spacecraft are fully retracted on March 16, 2022. The Artemis I stack atop the mobile launcher will roll out to Launch Complex 39B atop the crawler-transporter 2 for a wet dress rehearsal ahead of launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
Information
Taken in
Kennedy Space Center
Forfatter
NASA/Glen Benson
Beskrivelse
In this view looking down in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, all of the work platforms that surround the Artemis I Space Launch System (SLS) and Orion spacecraft are fully retracted on March 16, 2022. The Artemis I stack atop the mobile launcher will roll out to Launch Complex 39B atop the crawler-transporter 2 for a wet dress rehearsal ahead of launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
Opprettet den
Onsdag 16 Mars 2022
Source link
https://www.flickr.com/photos/nasakennedy/albums/72157664052441771
Besøk
40
Location
Vis på OpenStreetMap
Vurdering poengsum
ingen vurdering
Vurder dette bildet
License
Public Domain
Modified by WikiArchives
No (original)
Nedlastinger
0
EXIF Metadata
Canon Canon EOS 5D Mark IV
Make
Canon
Model
Canon EOS 5D Mark IV
DateTimeOriginal
2022:03:16 13:07:50
ApertureFNumber
f/3.5