KSC-20180831-PH-CHS01-0109.jpg KSC-20180831-PH-CHS01-0107ThumbnailsKSC-20180831-PH-CHS01-0110KSC-20180831-PH-CHS01-0107ThumbnailsKSC-20180831-PH-CHS01-0110KSC-20180831-PH-CHS01-0107ThumbnailsKSC-20180831-PH-CHS01-0110KSC-20180831-PH-CHS01-0107ThumbnailsKSC-20180831-PH-CHS01-0110
NASA's mobile launcher (ML) atop crawler-transporter 2 arrives at the top of Launch Pad 39B on Aug. 31, 2018, at the agency's Kennedy Space Center in Florida. The ML will undergo a fit check, followed by several days of systems testing. The 380-foot-tall mobile launcher is equipped with the crew access arm and several umbilicals that will provide power, environmental control, pneumatics, communication and electrical connections to NASA's Space Launch System (SLS) and Orion spacecraft. Exploration Ground Systems is preparing the ground systems necessary to launch SLS and Orion on Exploration Mission-1, missions to the Moon and on to Mars
Information
Taken in
Kennedy Space Center
Author
NASA/Cory Huston
Description
NASA's mobile launcher (ML) atop crawler-transporter 2 arrives at the top of Launch Pad 39B on Aug. 31, 2018, at the agency's Kennedy Space Center in Florida. The ML will undergo a fit check, followed by several days of systems testing. The 380-foot-tall mobile launcher is equipped with the crew access arm and several umbilicals that will provide power, environmental control, pneumatics, communication and electrical connections to NASA's Space Launch System (SLS) and Orion spacecraft. Exploration Ground Systems is preparing the ground systems necessary to launch SLS and Orion on Exploration Mission-1, missions to the Moon and on to Mars
Source link
https://www.flickr.com/photos/nasakennedy/albums/72157664052441771
Visits
27
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
Public Domain
Modified by WikiArchives
No (original)
Downloads
1
EXIF Metadata
Canon Canon EOS 5D Mark IV
Make
Canon
Model
Canon EOS 5D Mark IV
DateTimeOriginal
2018:08:31 14:24:59
ApertureFNumber
f/11.0