KSC-20180724-PH-KLS01-0070.jpg KSC-20180724-PH-KLS01-0068VirschäibillerKSC-20180724-PH-KLS01-0079KSC-20180724-PH-KLS01-0068VirschäibillerKSC-20180724-PH-KLS01-0079
The team that tested the umbilical lines and accessories that will connect from the mobile launcher to NASA's Space Launch System rocket and Orion spacecraft for Exploration Mission-1 hold a banner signing event July 24, 2018, to mark completion of testing at the Launch Equipment Test Facility (LETF) at NASA's Kennedy Space Center in Florida. Attending the event is Shawn Quinn, center, director of Engineering. A total of 21 umbilicals and launch accessories were tested on various simulators at the LETF before they were transferred to the mobile launcher for installation
Information
Taken in
Kennedy Space Center
Auteur
NASA/Kim Shiflett
Description
The team that tested the umbilical lines and accessories that will connect from the mobile launcher to NASA's Space Launch System rocket and Orion spacecraft for Exploration Mission-1 hold a banner signing event July 24, 2018, to mark completion of testing at the Launch Equipment Test Facility (LETF) at NASA's Kennedy Space Center in Florida. Attending the event is Shawn Quinn, center, director of Engineering. A total of 21 umbilicals and launch accessories were tested on various simulators at the LETF before they were transferred to the mobile launcher for installation
Erstallt den
Denschten 24 Juli 2018
Source link
https://www.flickr.com/photos/nasakennedy/albums/72157664052441771
Visitten
27
Location
View on OpenStreetMap
Bewäertungs-Stand
nach keng Bewäertung
Foto bewäerten
License
Public Domain
Modified by WikiArchives
No (original)
Downloads
0
Exif-Metadaten
Canon Canon EOS 5D Mark IV
Make
Canon
Model
Canon EOS 5D Mark IV
DateTimeOriginal
2018:07:24 12:02:03
ApertureFNumber
f/4.5