On a radar site on North Merritt Island, Fla., a crane lifts part of the structure to be added to the support base for a 50-foot C-band radar antenna. The radar will be used for Shuttle missions to track the launches and observe possible debris coming from the Shuttle. It will be used for the first time on STS-114. The launch window for the first Return to Flight mission is July 13 to July 31.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
On a radar site on North Merritt Island, Fla., a crane lifts part of the structure to be added to the support base for a 50-foot C-band radar antenna. The radar will be used for Shuttle missions to track the launches and observe possible debris coming from the Shuttle. It will be used for the first time on STS-114. The launch window for the first Return to Flight mission is July 13 to July 31.