KSC-05PD-1292.jpg KSC-05PD-1291ThumbnailsKSC-05PD-1293KSC-05PD-1291ThumbnailsKSC-05PD-1293
In the Vehicle Assembly Building at NASAs Kennedy Space Center, Ken Revay, the ET/SRB processing manager with United Space Alliance, inspects the newly installed liquid oxygen bellows heater on External Tank 120, recently removed from the orbiter Discovery. The new heater has been added to the feedline bellows to minimize the potential for ice and frost buildup. ET-120 will fly with Atlantis on the second Return to Flight mission STS-121. The launch window for STS-121 extends from Sept. 9 24.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
In the Vehicle Assembly Building at NASAs Kennedy Space Center, Ken Revay, the ET/SRB processing manager with United Space Alliance, inspects the newly installed liquid oxygen bellows heater on External Tank 120, recently removed from the orbiter Discovery. The new heater has been added to the feedline bellows to minimize the potential for ice and frost buildup. ET-120 will fly with Atlantis on the second Return to Flight mission STS-121. The launch window for STS-121 extends from Sept. 9 24.
Created on
Monday 13 June 2005
Source link
https://science.ksc.nasa.gov/gallery/photos/2005/
Visits
37
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0