KSC-05PD-0537.jpg KSC-05PD-0751MiniaturiKSC-05PD-0608KSC-05PD-0751MiniaturiKSC-05PD-0608
In the Orbiter Processing Facility bay 1 at NASAs Kennedy Space Center, a Hyster fork lift (left) holding Space Shuttle Main Engine (SSME) closes in on position number 1 for installation in Atlantis. Overall, an SSME weighs approximately 7,000 pounds. Three engines provide the thrust, along with the two Solid Rocket Boosters, for liftoff. After about 2 minutes, the two boosters are spent and are separated from the external tank. The SSMEs continue firing for about 8 minutes. They shut down just before the craft is inserted into orbit. The SSMEs are tested at Stennis Space Center in Mississippi. Atlantis is being processed for the second Return to Flight mission, STS-121, scheduled for launch in a window from July 12 through July 31.
Information
Taken in
Kennedy Space Center
Autor
NASA
Descriere
In the Orbiter Processing Facility bay 1 at NASAs Kennedy Space Center, a Hyster fork lift (left) holding Space Shuttle Main Engine (SSME) closes in on position number 1 for installation in Atlantis. Overall, an SSME weighs approximately 7,000 pounds. Three engines provide the thrust, along with the two Solid Rocket Boosters, for liftoff. After about 2 minutes, the two boosters are spent and are separated from the external tank. The SSMEs continue firing for about 8 minutes. They shut down just before the craft is inserted into orbit. The SSMEs are tested at Stennis Space Center in Mississippi. Atlantis is being processed for the second Return to Flight mission, STS-121, scheduled for launch in a window from July 12 through July 31.
Source link
https://science.ksc.nasa.gov/gallery/photos/2005/
Vizite
48
Location
View on OpenStreetMap
Scor mediu
nici o evaluare
Evaluează aceasta imagine
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Descărcări
1