KSC-04PD-0671.jpg KSC-04PD-0670ThumbnailsKSC-04PD-0672KSC-04PD-0670ThumbnailsKSC-04PD-0672
At Astrotech Space Operations facilities near KSC, workers make adjustments to the Mercury Surface, Space Environment, Geochemistry and Ranging (MESSENGER) spacecraft now resting on the turnover fixture. Workers will perform the propulsion system phasing test firing gas through the thrusters in order to verify that the right thrusters fire when expected as part of prelaunch testing at the site. Launch is scheduled for May 11 from Pad 17-B, Cape Canaveral Air Force Station. The spacecraft will fly past Venus three times and Mercury twice before starting a year-long orbital study of Mercury in July 2009.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
At Astrotech Space Operations facilities near KSC, workers make adjustments to the Mercury Surface, Space Environment, Geochemistry and Ranging (MESSENGER) spacecraft now resting on the turnover fixture. Workers will perform the propulsion system phasing test firing gas through the thrusters in order to verify that the right thrusters fire when expected as part of prelaunch testing at the site. Launch is scheduled for May 11 from Pad 17-B, Cape Canaveral Air Force Station. The spacecraft will fly past Venus three times and Mercury twice before starting a year-long orbital study of Mercury in July 2009.
Source link
https://science.ksc.nasa.gov/gallery/photos/2004/captions/
Visits
25
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0