KSC-03PD-0727.jpg KSC-03PD-0726ThumbnailsISS006-E-39140KSC-03PD-0726ThumbnailsISS006-E-39140
In the Payload Hazardous Servicing Facility, workers check out the Mars Exploration Rover-1 (background). In the foreground is part of the lander. While at KSC, each of the two rovers, their aeroshells and landers will undergo a full mission simulation. After spin balance testing, each spacecraft will be mated to a solid propellant upper stage booster that will propel the spacecraft out of Earth orbit. Approximately 10 days before launch they will be transported to the launch pad for mating with their respective Boeing Delta II rockets. The rovers will serve as robotic geologists to seek answers about the evolution of Mars, particularly for a history of water. The rovers are identical to each other, and will land at different regions of Mars. Launch of the MER-1 is scheduled for May 30. MER-2 will follow June 25.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
In the Payload Hazardous Servicing Facility, workers check out the Mars Exploration Rover-1 (background). In the foreground is part of the lander. While at KSC, each of the two rovers, their aeroshells and landers will undergo a full mission simulation. After spin balance testing, each spacecraft will be mated to a solid propellant upper stage booster that will propel the spacecraft out of Earth orbit. Approximately 10 days before launch they will be transported to the launch pad for mating with their respective Boeing Delta II rockets. The rovers will serve as robotic geologists to seek answers about the evolution of Mars, particularly for a history of water. The rovers are identical to each other, and will land at different regions of Mars. Launch of the MER-1 is scheduled for May 30. MER-2 will follow June 25.
Source link
https://science.ksc.nasa.gov/gallery/photos/2003/
Visits
28
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0