KSC-03PD-0597.jpg KSC-03PD-0596MiniaturesKSC-03PD-0598KSC-03PD-0596MiniaturesKSC-03PD-0598
A worker in the Payload Hazardous Servicing Facility looks closely at the Mars Exploration Rover-2. Each rover , aeroshell and lander will undergo a full mission simulation while at KSC. All flight elements will then be integrated. After spin balance testing, each spacecraft will be mated to a solid propellant upper stage booster that will propel it out of Earth orbit. The rovers will serve as robotic geologists to seek answers about the evolution of Mars, particularly for a history of water. The rovers will be identical to each other, but will land at different regions of Mars. Launch of the MER-1 is scheduled for May 30. MER-2 will follow June 25.
Information
Taken in
Kennedy Space Center
Auteur
NASA
Description
A worker in the Payload Hazardous Servicing Facility looks closely at the Mars Exploration Rover-2. Each rover , aeroshell and lander will undergo a full mission simulation while at KSC. All flight elements will then be integrated. After spin balance testing, each spacecraft will be mated to a solid propellant upper stage booster that will propel it out of Earth orbit. The rovers will serve as robotic geologists to seek answers about the evolution of Mars, particularly for a history of water. The rovers will be identical to each other, but will land at different regions of Mars. Launch of the MER-1 is scheduled for May 30. MER-2 will follow June 25.
Source link
https://science.ksc.nasa.gov/gallery/photos/2003/
Visites
40
Location
Voir dans OpenStreetMap
Bilan
pas de note
Votez pour cette image
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Téléchargements
0