KSC-08PD-2014.jpg KSC-08PD-2012EsikatselukuvatKSC-08PD-2015KSC-08PD-2012EsikatselukuvatKSC-08PD-2015
In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the overhead crane lifts the ground support equipment for the STS-125 Hubble Servicing Mission away from the thermal vacuum fixture. The GSE are carriers, or pallets, that will hold equipment in space shuttle Atlantis’ payload bay. Under the protective covering of the carrier can be seen the soft capture mechanism. The carrier will be moved to a work stand. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the servicing mission. The three payload carriers or pallets are the Flight Support System, the Super Lightweight Interchangeable Carrier and the Orbital Replacement Unit Carrier. At the end of July, a fourth and final carrier, the Multi-Use Lightweight Equipment carrier will join the others in the Payload Hazardous Servicing Facility where the Hubble payload is being prepared for launch.
Information
Taken in
Kennedy Space Center
Tekijä
NASA/Cory Huston
Kuvaus
In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the overhead crane lifts the ground support equipment for the STS-125 Hubble Servicing Mission away from the thermal vacuum fixture. The GSE are carriers, or pallets, that will hold equipment in space shuttle Atlantis’ payload bay. Under the protective covering of the carrier can be seen the soft capture mechanism. The carrier will be moved to a work stand. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the servicing mission. The three payload carriers or pallets are the Flight Support System, the Super Lightweight Interchangeable Carrier and the Orbital Replacement Unit Carrier. At the end of July, a fourth and final carrier, the Multi-Use Lightweight Equipment carrier will join the others in the Payload Hazardous Servicing Facility where the Hubble payload is being prepared for launch.
Source link
https://images.nasa.gov/search-results?q=STS-125&page=19&media=image&yearStart=2008&yearEnd=2010
Vierailut
50
Location
View on OpenStreetMap
Pisteet
ei arvosteltu
Arvostele tämä kuva
License
Public Domain
Modified by WikiArchives
No (original)
Lataukset
0
EXIF Metatiedot
DateTimeOriginal
2008:07:17 00:00:00