KSC-08PD-2494.jpg KSC-08PD-2493ThumbnailsKSC-08PD-2496KSC-08PD-2493ThumbnailsKSC-08PD-2496
A crane lifts space shuttle Atlantis higher into the upper levels of the Vehicle Assembly Building at NASA's Kennedy Space Center. The shuttle will be moved into high bay 3 and lowered for stacking with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for 1:34 a.m. EDT Oct. 8.
Information
Taken in
Kennedy Space Center
Author
NASA/Dimitri Gerondidakis
Description
A crane lifts space shuttle Atlantis higher into the upper levels of the Vehicle Assembly Building at NASA's Kennedy Space Center. The shuttle will be moved into high bay 3 and lowered for stacking with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for 1:34 a.m. EDT Oct. 8.
Source link
https://images.nasa.gov/search-results?q=STS-125&page=15&media=image&yearStart=2008&yearEnd=2010
Visits
49
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
Public Domain
Modified by WikiArchives
No (original)
Downloads
0
EXIF Metadata
DateTimeOriginal
2008:08:23 00:00:00