KSC-08PD-2486.jpg KSC-08PD-2485ThumbnailsKSC-08PD-2487KSC-08PD-2485ThumbnailsKSC-08PD-2487
In the Vehicle Assembly Building transfer aisle at NASA's Kennedy Space Center, an overhead crane attached to space shuttle Atlantis lifts the shuttle from its transporter. Atlantis will be lifted to vertical for transfer to high bay 3 to be stacked with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8.
Information
Taken in
Kennedy Space Center
Author
NASA/Jack Pfaller
Description
In the Vehicle Assembly Building transfer aisle at NASA's Kennedy Space Center, an overhead crane attached to space shuttle Atlantis lifts the shuttle from its transporter. Atlantis will be lifted to vertical for transfer to high bay 3 to be stacked with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8.
Source link
https://images.nasa.gov/search-results?q=STS-125&page=15&media=image&yearStart=2008&yearEnd=2010
Visits
44
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
Public Domain
Modified by WikiArchives
No (original)
Downloads
0
EXIF Metadata
DateTimeOriginal
2008:08:23 00:00:00