STS-113 Commander James Wetherbee (left) reaches for the release level on the slidewire basket during emergency egress practice from the 195-foot level of the Fixed Service Structure on Launch Pad 39A. At right is Pilot Paul Lockhart. The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
STS-113 Commander James Wetherbee (left) reaches for the release level on the slidewire basket during emergency egress practice from the 195-foot level of the Fixed Service Structure on Launch Pad 39A. At right is Pilot Paul Lockhart. The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.