KSC-02PD-1203.jpg JSC2002-E-34617ThumbnailsKSC-02PD-1204JSC2002-E-34617ThumbnailsKSC-02PD-1204JSC2002-E-34617ThumbnailsKSC-02PD-1204JSC2002-E-34617ThumbnailsKSC-02PD-1204
Kristin Rumpf, with United Space Alliance - Main Propulsion System Engineering, looks over part of Endeavour before welding of the flow liner begins. Endeavour is scheduled to fly on mission STS-113 in November. The mission payload is the P1 Integrated Truss Structure, the first portside truss to go to the International Space Station, and will be attached to the central truss segment, S0, on the Station. Also additional cooling radiators will be delivered but will remain stowed until flight 12A.1.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
Kristin Rumpf, with United Space Alliance - Main Propulsion System Engineering, looks over part of Endeavour before welding of the flow liner begins. Endeavour is scheduled to fly on mission STS-113 in November. The mission payload is the P1 Integrated Truss Structure, the first portside truss to go to the International Space Station, and will be attached to the central truss segment, S0, on the Station. Also additional cooling radiators will be delivered but will remain stowed until flight 12A.1.
Source link
https://science.ksc.nasa.gov/gallery/photos/2002/
Visits
40
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0