KSC-00PP-0879.jpg KSC-00PP-0877ThumbnailsKSC-00PP-0880KSC-00PP-0877ThumbnailsKSC-00PP-0880
In the Orbiter Processing Facility bay 1, workers check the placement of the Pressurized Mating Adapter -3 (PMA-3) as the overhead crane places it in the payload bay of the orbiter Discovery. A component of the International Space Station, the PMA-3 will fly on Shuttle mission STS-92, scheduled to launch Oct. 5. The mission will be the fifth flight to the Space Station, and the 100th Shuttle flight overall. PMA-3 provides shuttle docking port for solar array installation on flight 4A (mission STS-97 scheduled for Nov. 30), and Lab installation on flight 5A (mission STS-98, scheduled for Jan. 18, 2001).
Information
Taken in
Kennedy Space Center
Author
NASA
Description
In the Orbiter Processing Facility bay 1, workers check the placement of the Pressurized Mating Adapter -3 (PMA-3) as the overhead crane places it in the payload bay of the orbiter Discovery. A component of the International Space Station, the PMA-3 will fly on Shuttle mission STS-92, scheduled to launch Oct. 5. The mission will be the fifth flight to the Space Station, and the 100th Shuttle flight overall. PMA-3 provides shuttle docking port for solar array installation on flight 4A (mission STS-97 scheduled for Nov. 30), and Lab installation on flight 5A (mission STS-98, scheduled for Jan. 18, 2001).
Created on
Friday 7 July 2000
Source link
https://science.ksc.nasa.gov/gallery/photos/2000/
Visits
29
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0