In the Vehicle Assembly Building, workers check the rings on the segments of a solid rocket booster (SRB) before mating them. The SRB is part of the stack for the STS-92 mission, scheduled for launch Oct. 5 from Launch Pad 39A.
Information
Taken in
Kennedy Space Center
擁有者
NASA
描述
In the Vehicle Assembly Building, workers check the rings on the segments of a solid rocket booster (SRB) before mating them. The SRB is part of the stack for the STS-92 mission, scheduled for launch Oct. 5 from Launch Pad 39A.