KSC-00PP-0405.jpg KSC-00PP-0404ThumbnailsKSC-00PP-0406KSC-00PP-0404ThumbnailsKSC-00PP-0406
Just after departing the Vehicle Assembly Building, the Space Shuttle Atlantis aboard the crawler-transporter wends its way to Launch Pad 39A. The crawler-transporter carries its cargo at 1 mph, taking about five hours to cover the 3.4 miles from the Vehicle Assembly Building to the launch pad. A leveling system on the crawler-transporter keeps the top of the Space Shuttle vertical, especially negotiating the ramp leading to the launch pads and when it is raised and lowered on pedestals at the pad. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
Just after departing the Vehicle Assembly Building, the Space Shuttle Atlantis aboard the crawler-transporter wends its way to Launch Pad 39A. The crawler-transporter carries its cargo at 1 mph, taking about five hours to cover the 3.4 miles from the Vehicle Assembly Building to the launch pad. A leveling system on the crawler-transporter keeps the top of the Space Shuttle vertical, especially negotiating the ramp leading to the launch pads and when it is raised and lowered on pedestals at the pad. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda.
Source link
https://science.ksc.nasa.gov/gallery/photos/2000/
Visits
32
Location
View on OpenStreetMap
Rating score
no rating
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0