KSC-99PP-1360.jpg KSC-99PP-1359ThumbnailsKSC-99PP-1361KSC-99PP-1359ThumbnailsKSC-99PP-1361KSC-99PP-1359ThumbnailsKSC-99PP-1361KSC-99PP-1359ThumbnailsKSC-99PP-1361
Inside the Operations and Checkout Building, overhead cranes move a segment of the International Space Station (ISS), the port-side P3 truss, toward a workstand. The truss is scheduled to be added to the ISS on mission STS-115 in 2002 aboard Space Shuttle Atlantis. The second port truss segment, P3 will be attached to the first port truss segment (P1).
Information
Taken in
Kennedy Space Center
Author
NASA
Description
Inside the Operations and Checkout Building, overhead cranes move a segment of the International Space Station (ISS), the port-side P3 truss, toward a workstand. The truss is scheduled to be added to the ISS on mission STS-115 in 2002 aboard Space Shuttle Atlantis. The second port truss segment, P3 will be attached to the first port truss segment (P1).
Source link
https://science.ksc.nasa.gov/gallery/photos/1999/
Visits
69
Location
View on OpenStreetMap
Rating score
no rate
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0