KSC-97PC-0410 - The Space Shuttle Columbia begins its slow roll-out move from the Vehicle Assembly Building (VAB) on its way to Launch Pad 39A in preparation for the STS-83 mission, at the Kennedy Space Center (KSC). The Microgravity Science Laboratory-1 (MSL-1) Spacelab Module is the primary payload on this scheduled 16-day space mission.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
KSC-97PC-0410 - The Space Shuttle Columbia begins its slow roll-out move from the Vehicle Assembly Building (VAB) on its way to Launch Pad 39A in preparation for the STS-83 mission, at the Kennedy Space Center (KSC). The Microgravity Science Laboratory-1 (MSL-1) Spacelab Module is the primary payload on this scheduled 16-day space mission.