KSC-98PC-0992.jpg KSC-98PC-0985МиниатюриKSC-98PC-0993KSC-98PC-0985МиниатюриKSC-98PC-0993
(Center) The Multi-Purpose Launch Module, named Leonardo, awaits processing in the Space Station Processing Facility (SSPF). At left is a Rack Insertion Device. Above the Leonardo are the windows of the tour room where visitors can watch the activities in the SSPF. Scheduled to be launched on STS-100 on Dec. 2, 1999, the Italian-built MPLM will be carried in the payload bay of the Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the International Space Station. The Leonardo is the first of three modules being provided by Alenia Aerospazio. The second MPLM, to be handed over in April 1999, is named Raffaello. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001.
Information
Taken in
Kennedy Space Center
Автор
NASA
Описание
(Center) The Multi-Purpose Launch Module, named Leonardo, awaits processing in the Space Station Processing Facility (SSPF). At left is a Rack Insertion Device. Above the Leonardo are the windows of the tour room where visitors can watch the activities in the SSPF. Scheduled to be launched on STS-100 on Dec. 2, 1999, the Italian-built MPLM will be carried in the payload bay of the Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the International Space Station. The Leonardo is the first of three modules being provided by Alenia Aerospazio. The second MPLM, to be handed over in April 1999, is named Raffaello. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001.
Source link
https://science.ksc.nasa.gov/gallery/photos/1998/captions/KSC-98PC-0992.html
Посещения
199
Location
Виж в OpenStreetMap
Рейтинг
няма оценка
Оцени тази снимка
License
CC BY-NC
Modified by WikiArchives
No (original)
Сваляния
0