GRC-1964-C-71124.jpg GRC-1964-C-71100ThumbnailsKSC-64C-2975GRC-1964-C-71100ThumbnailsKSC-64C-2975GRC-1964-C-71100ThumbnailsKSC-64C-2975GRC-1964-C-71100ThumbnailsKSC-64C-2975
During a Surveyor faring separation test in SPC No. 1, the deflector bulkheads were ripped from their bindings, and the shroud tips were broken off above the catcher pads.
Information
Taken in
Other
Author
NASA
Description
During a Surveyor faring separation test in SPC No. 1, the deflector bulkheads were ripped from their bindings, and the shroud tips were broken off above the catcher pads.
Source link
https://www1.grc.nasa.gov/historic-facilities/altitude-wind-tunnel/spc-centaur-testing/
Visits
43
Rating score
no rate
Rate this photo
License
Public Domain
Modified by WikiArchives
No (original)
Downloads
1