KSC-03PD-0961.jpg KSC-03PD-0945DiapositibakKSC-03PD-0980KSC-03PD-0945DiapositibakKSC-03PD-0980
Workers in Building AE prepare the Space Infrared Telescope Facility (SIRTF), in the background, for buildup of the payload canister. SIRTF will be mated with the Delta II launch vehicle via the payload attach fitting at the bottom. SIRTF is currently scheduled for transportation to Launch Complex 17-B, Cape Canaveral Air Force Station, and hoisting atop the Delta II on or about April 4.
Information
Taken in
Kennedy Space Center
Egilea
NASA
Azalpena
Workers in Building AE prepare the Space Infrared Telescope Facility (SIRTF), in the background, for buildup of the payload canister. SIRTF will be mated with the Delta II launch vehicle via the payload attach fitting at the bottom. SIRTF is currently scheduled for transportation to Launch Complex 17-B, Cape Canaveral Air Force Station, and hoisting atop the Delta II on or about April 4.
Source link
https://science.ksc.nasa.gov/gallery/photos/2003/
Bisitak
24
Location
View on OpenStreetMap
Kalifikazioa
baloratu gabe
Balioestea
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Deskargak
1