KSC-02PD-0249.jpg KSC-02PD-0248MiniaturesKSC-02PD-0263KSC-02PD-0248MiniaturesKSC-02PD-0263
Employees watch as Orbiter Atlantis rolls out of the Orbiter Processing Facility on its way to the Vehicle Assembly Building for space vehicle mate. As part of final preparations before transfer to the launch pad, Atlantis will be lifted vertically into its VAB high bay and mated to the twin solid rocket boosters and external tank. The STS-110 mission resumes International Space Station assembly operations with the delivery of the S0 truss, which will support solar panels providing additional power to the Station. The payload will also include the first part of a Mobile Transporter that will provide a moveable base for the Station’s Canadian robotic arm. STS-110 is scheduled for launch April 4.
Information
Taken in
Kennedy Space Center
Auteur
NASA
Description
Employees watch as Orbiter Atlantis rolls out of the Orbiter Processing Facility on its way to the Vehicle Assembly Building for space vehicle mate. As part of final preparations before transfer to the launch pad, Atlantis will be lifted vertically into its VAB high bay and mated to the twin solid rocket boosters and external tank. The STS-110 mission resumes International Space Station assembly operations with the delivery of the S0 truss, which will support solar panels providing additional power to the Station. The payload will also include the first part of a Mobile Transporter that will provide a moveable base for the Station’s Canadian robotic arm. STS-110 is scheduled for launch April 4.
Créée le
Jeudi 7 Mars 2002
Source link
https://science.ksc.nasa.gov/gallery/photos/2002/captions/
Visites
62
Location
Voir dans OpenStreetMap
Score
pas de note
Notez cette photo
License
CC BY-NC
Modified by WikiArchives
No (original)
Téléchargements
1
Données EXIF
NIKON CORPORATION NIKON D1
Make
NIKON CORPORATION
Model
NIKON D1
DateTimeOriginal
2002:03:07 00:32:49
ApertureFNumber
f/10.0