KSC-00PP-0873.jpg KSC-00PP-0861ΜικρογραφίεςKSC-00PP-0907KSC-00PP-0861ΜικρογραφίεςKSC-00PP-0907
In the Space Station Processing Facility, an overhead crane lowers the Pressurized Mating Adapter -3 (PMA-3) into a payload canister for transport to the Orbiter Processing Facility. Workers at the sides and below watch the process. The PMA-3, a component of the International Space Station, is part of the payload on Space Shuttle mission STS-92, scheduled to launch Oct. 5. The mission will be the fifth flight to the Space Station, and the 100th Shuttle flight overall. PMA-3 provides shuttle docking port for solar array installation on flight 4A (mission STS-97 scheduled for Nov. 30), and Lab installation on flight 5A (mission STS-98, scheduled for Jan. 18, 2001).
Information
Taken in
Kennedy Space Center
Συντάκτης
NASA
Περιγραφή
In the Space Station Processing Facility, an overhead crane lowers the Pressurized Mating Adapter -3 (PMA-3) into a payload canister for transport to the Orbiter Processing Facility. Workers at the sides and below watch the process. The PMA-3, a component of the International Space Station, is part of the payload on Space Shuttle mission STS-92, scheduled to launch Oct. 5. The mission will be the fifth flight to the Space Station, and the 100th Shuttle flight overall. PMA-3 provides shuttle docking port for solar array installation on flight 4A (mission STS-97 scheduled for Nov. 30), and Lab installation on flight 5A (mission STS-98, scheduled for Jan. 18, 2001).
Δημιουργήθηκε στις
Πέμπτη 6 Ιούλιος 2000
Source link
https://science.ksc.nasa.gov/gallery/photos/2000/
Επισκέψεις
30
Location
Προβολή στο OpenStreetMap
Βαθμολογία κατάταξης
χωρίς βαθμό
Βαθμολογήστε τη φωτογραφία
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Λήψεις
0